{"id":12122,"date":"2020-05-06T12:26:00","date_gmt":"2020-05-06T10:26:00","guid":{"rendered":"https:\/\/stage2.zufall.de\/zufall-grows-with-an-eye-to-the-future\/"},"modified":"2025-06-16T13:42:59","modified_gmt":"2025-06-16T11:42:59","slug":"zufall-grows-with-an-eye-to-the-future","status":"publish","type":"post","link":"https:\/\/www.zufall.de\/en\/zufall-grows-with-an-eye-to-the-future\/","title":{"rendered":"ZUFALL GROWS WITH AN EYE TO THE FUTURE"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-post\" data-elementor-id=\"12122\" class=\"elementor elementor-12122 elementor-4154\" data-elementor-post-type=\"post\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-2235901f elementor-section-full_width elementor-section-height-min-height elementor-section-height-default elementor-section-items-middle\" data-id=\"2235901f\" data-element_type=\"section\" data-e-type=\"section\" data-settings=\"{&quot;background_background&quot;:&quot;classic&quot;}\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-12d7b870\" data-id=\"12d7b870\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap\">\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-57ba70e8 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"57ba70e8\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-7192d71d\" data-id=\"7192d71d\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-269401c7 elementor-widget elementor-widget-spacer\" data-id=\"269401c7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-0090778 elementor-widget elementor-widget-theme-post-title elementor-page-title elementor-widget-heading\" data-id=\"0090778\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"theme-post-title.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h1 class=\"elementor-heading-title elementor-size-default\">ZUFALL GROWS WITH AN EYE TO THE FUTURE<\/h1>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-1debe51 elementor-widget elementor-widget-theme-post-excerpt\" data-id=\"1debe51\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"theme-post-excerpt.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\tZUFALL logistics group starts construction work for its new logistics centre. In the Fulda branch, preparations for the construction of the logistics centre in Flieden have been underway for more than two years. At this location, the company will concentrate its logistics for tyres.\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-17d28ec elementor-widget elementor-widget-spacer\" data-id=\"17d28ec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-a36b3a6 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"a36b3a6\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-1fcdb15\" data-id=\"1fcdb15\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<section class=\"elementor-section elementor-inner-section elementor-element elementor-element-8b9ed10 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"8b9ed10\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-83c0340\" data-id=\"83c0340\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-2c70159 elementor-widget elementor-widget-text-editor\" data-id=\"2c70159\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p>The large-scale project was planned and implemented in cooperation with Goodman, the world\u2018s leading project developer for logistics properties. LIST Bau Nordhorn is responsible for the turnkey construction of the property.<\/p>\n<p>\u201eIt was an unexpectedly long tug-of-war,\u201c says branch manager Christoph G\u00f6bel, looking back on the past months and emphasising, \u201eIn the end, it is thanks to the tireless efforts of the mayor of Flieden, Christian Henkel, as well as his deputy Winfried Happ and the municipal council that we are finally on the home straight after a long delay. The push to the home straight took place with the start of construction at the end of February.&nbsp; At that time, the regional company Bickhardt Bau began earthworks. Due to the restrictions associated with the Corona pandemic, the originally planned ceremonial opening of the construction site, including the official \u201eground-breaking\u201c with representatives of the town of Flieden, those responsible for the project partner&nbsp;Goodman&nbsp;as well as&nbsp;ZUFALL&nbsp;logistics group and the local press, could not take place. Instead, a topping-out ceremony and\/or a handover ceremony are now planned.&nbsp;<\/p>\n<p>The entire site covers approximately 77,500 square metres. A logistics hall of over 38,500 square metres with four sections (units) and associated mezzanines (1,500 square metres each) is being built on it. The earthmoving comprises about 100,000 cubic metres. However, the earth moved remains on the site and is used for levelling the terrain.&nbsp;ZUFALL&nbsp;provides balancing green spaces and the use of state-of-the-art LED technology and photovoltaic systems are also part of the project. The DGNB certification will prove the sustainability of the construction project.<\/p>\n<p>Unit 1 &#8211; the first of four sections &#8211; is scheduled for completion by the end of October 2020. Units 2 to 4 will follow in approximately four-week intervals. The goal is to complete the work by 11 January 2021 and also to put the last part (Unit 4) of the logistics centre into operation on this date. In order to be able to keep to this tight schedule, perfect communication is required between Goodman, as the building owner and controller of the construction site, the general contractor LIST Bau Nordhorn, the planning department of the municipality and &nbsp;ZUFALL&nbsp;logistics group.&nbsp;Christof Prange, Head of Business Development at Goodman, says, \u201eWe are very pleased to develop another property for&nbsp;Zufall&nbsp;logistics group. The long-term partnership shows that our sustainable properties are convincing all along the line: qualitatively, technically and always focused on the flexible requirements of the customer.\u201c<\/p>\n<p>After commissioning, the logistics centre will operate daily from 6 a.m. to 7 p.m. &#8211; night-time traffic is not currently planned. In addition to the approximately 38,500-square-metre logistics hall and the associated 1,100-square-metre outdoor storage area for empty racks,&nbsp;<span style=\"color: var( --e-global-color-text );\">an office building with 1,400 square metres of office space is being built here, the new gatekeeper\u2018s building covers 57 square metres and 60 square metres are available to the drivers in the recreation room. In addition, 128 cars and ten trucks can be parked on the premises.<\/span><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t<div class=\"elementor-column elementor-col-50 elementor-inner-column elementor-element elementor-element-edef459\" data-id=\"edef459\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-dfa4c6d elementor-widget elementor-widget-text-editor\" data-id=\"dfa4c6d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><span style=\"color: var( --e-global-color-text );\">The warehouse used for the tyre business offers ZUFALL logistics group the opportunity to concentrate its expertise in this industry, developed over many decades, at one location. About 80 to 100 employees will work here in the future and concentrate the tyre division, which has been spread over several locations up to now, in Flieden. With ZUFALL tyre logistics GmbH (ZTL), ZUFALL logistics group founded a subsidiary for this purpose in 2019, which will combine the tyre business (e.g., logistics services for Hankook Reifen Deutschland GmbH) and expand it in the long term.<\/span><\/p><p>With the founding of ZUFALL tyre logistics, ZUFALL bundled its contract and transport logistics know-how for the tyre industry. \u201eThe tyre business requires the highest degree of flexibility in handling large and small quantities, as it is subject to extreme seasonal fluctuations,\u201c reports ZUFALL Managing Director J\u00fcrgen Wolpert, adding, \u201eOur more than 90 years of logistics know-how combined with the tyre expertise and partnership with the tyre manufacturers from Korea, which has grown over 15 years, helps us to be able to offer a service portfolio optimised specifically for the tyre industry.\u201c ZTL offers its customers value-added services far beyond simple warehousing. For Hankook, for example, ZUFALL manages the entire supply chain from the moment the tyres arrive in Europe &#8211; for example at the Dutch seaport of Rotterdam. At peak times, around 60,000 tyres pass through the hands of ZUFALL employees every day. Thanks to its central location in Flieden near Fulda, ZUFALL can transport the tyres to almost any German location within 24 hours and, in special cases, within six hours. Thanks to state-of-the-art sprinkler technology, customers can rely on the safe storage of the tyres at all times.<\/p><p> <\/p><p><strong>New logistics centre:<\/strong><\/p><p>Site: 7.74 hectares<br>Earth movement: 100,000 cubic metres<br>Storage area: 45,000 square metres<br>Hall height: 12 metres<br>Max. storage height: 9.70 metres<br>Jobs: 80 to 100<br>Operating hours: 6 a.m. to 7 p.m., no night service<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<div class=\"elementor-element elementor-element-f63c20a elementor-widget elementor-widget-spacer\" data-id=\"f63c20a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"spacer.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-spacer\">\n\t\t\t<div class=\"elementor-spacer-inner\"><\/div>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>ZUFALL logistics group starts construction work for its new logistics centre. In the Fulda branch, preparations for the construction of the logistics centre in Flieden have been underway for more than two years. At this location, the company will concentrate its logistics for tyres.<\/p>\n","protected":false},"author":2,"featured_media":33795,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"elementor_header_footer","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[491],"tags":[1222],"class_list":["post-12122","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-logistic","tag-contract-logistics"],"_links":{"self":[{"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/posts\/12122","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/comments?post=12122"}],"version-history":[{"count":1,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/posts\/12122\/revisions"}],"predecessor-version":[{"id":49103,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/posts\/12122\/revisions\/49103"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/media\/33795"}],"wp:attachment":[{"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/media?parent=12122"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/categories?post=12122"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zufall.de\/en\/wp-json\/wp\/v2\/tags?post=12122"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}